Notice of planned works.
We’re writing to let you know about some planned works that we will be carrying out in your area., in order to reduce the amount of emails you receive we have amalgamated a number of notifications into this one email. Please click on the link below each item for more details.
Solihull
Notice of Northbound Lane Closure on A452 Kenilworth Road
BBV will be installing a new safety barrier along the northbound carriageway of the A452 Kenilworth Road between the Aston Martin Roundabout and Meriden Road Island. To do this safely, we will need close a lane of the northbound carriageway between 9:30am until 3:30pm on 6 March 2023.
https://www.hs2.org.uk/work-items/notice-of-northbound-lane-closure-on-a452-kenilworth-road-2/
Notice of overnight closure of A452 northbound slip road
BBV have been significantly reconfiguring the Junction of the A446 Stonebridge Road and A452 Chester Road near Birmingham Business Park. The new bridge over the M42 is already taking some vehicular traffic using a temporary lane configuration. As we prepare for its permanent and intended configuration some remedial work is required such as removal temporary safety barriers parapet work, surface works and additional electrical and drainage work. To minimise any disruption the work will only take place at night and a full diversion via junction 4 of the M6 will be in place. The work will take place on overnight from 3 March until 6 March closing at 9pm at night and reopening at 5am the following morning.
https://www.hs2.org.uk/work-items/notice-of-overnight-closure-of-a452-northbound-slip-road/Notice of A452 Southbound Road Closure
BBV have been significantly reconfiguring the junction of the A446 Stonebridge Road and A452 Chester Road near Birmingham Business Park. The new bridge over the A446 that carries the southbound slip road is already open to vehicular traffic, however as we move to completion some extra work is needed to create a pedestrian footway and some new laybys. To do this safely we will need to close the road at night between 6 March and 18 March from 9pm at night until 6am the following morning. Between 9-12 March we will not close the road until 10pm to minimise the disruption during the Crufts dog show at the NEC. A fully signed diversion will be in place.
https://www.hs2.org.uk/work-items/notice-of-a452-southbound-road-closure/Notice of traffic management on Hallmeadow/Station Road Roundabout
HS2 will deliver one of the most environmentally responsible infrastructure projects in the UK, to help achieve this, Balfour Beatty Vinci (BBV) has been constructing and installing an internal haul road as part of our works. The haul road lets us take lorries off Kenilworth Road on to our site, reducing the number of large vehicles on local roads.
Following the completion of the parking bays, we will be starting further works to create a new entrance to this haul road. This will be at the southern end of the Hallmeadow Road at the roundabout with Station Road and will allow for deliveries to south of the West Coast Mainline. In order to do this, a number of utilities that are in the existing verge will need to be diverted requiring traffic management on the roundabout.
Temporary traffic lights will be installed on 6 March and will be in operation all day every day until the new haul road in in operation in the summer. Please note that although the traffic lights will be in operation all day and all night the work will be limited to our core working hours. 8am until 6pm Monday to Friday, 8am until 1pm on Saturdays and not at all on Sundays and Bank holidays. If these dates change, we will send you a further update.
https://www.hs2.org.uk/work-items/notice-of-traffic-management-on-hallmeadow-station-road-roundabout/
Warwickshire
M54 footpath closure and diversion Coleshill
Balfour Beatty Vinci (BBV) is working in partnership HS2 Ltd to build the new railway in your area. We will be closing a short section of the M54 footpath, we have set out a temporary alternative route over our construction period. The section of the footpath to be closed is marked orange, the alternative route is marked in blue and existing footpaths are marked in black on the attached notification.
https://www.hs2.org.uk/work-items/m54-footpath-closure-and-diversion-coleshill/Notice of overnight closure on Gilson Road, Coleshill
To continue preparation for our works for the Water Orton Viaducts that will carry the HS2 trainline over the M42 and M6 Toll, we will complete utility diversion works along Gilson Road. As part of our continued 24-hour traffic management that is in place on Gilson Road until Friday 31 March, we will install five nights of overnight closures on this section of Gilson Road. The closures will take place from Monday 13 March finishing on Saturday 18 March, with the traffic management in place from 9.00pm until 5.00am each night. A clear diversion route will be in place throughout the time of the closures and the location of this is shown below.
https://www.hs2.org.uk/work-items/notice-of-overnight-closure-on-gilson-road-coleshill/
Our work is subject to change – for live traffic information go-to one.network and please check on-the-road signs.
- For further information view or download the link to the works notification below each item
- Use our in your area map to search current and planned HS2 works, developments and opportunities in your area.
- Visit your local community webpages to find information about HS2 works and developments in your area.
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk.
Yours sincerely,
HS2 Community Engagement team
Contact our Helpdesk team all day, every day of the year by:
Freephone: 08081 434 434 | Minicom: 08081 456 472 | Email: HS2Enquiries@hs2.org.uk
To keep up to date with what is happening in your local area, visit: www.hs2inyourarea.co.uk