The work will we be doing
BBV will be carrying out trial hole excavations in the existing verge from the
Packington Lane turning to Stonebridge Island on the A452 south bound. This
is to locate and identify existing utility services.
When these works will take place
Works are scheduled from Tuesday 9 March through to Saturday 13 March.
These works are subject to weather conditions.
Lane 1 will be closed between 9.00pm to 6.00am for four nights. We will keep
you updated through www.hs2insolihull.co.uk
For the extent of the lane closure Please click HERE A452 South lane closure reva